P1171 MINI Possible Causes
- Faulty ambient pressure sensor
- Ambient pressure sensor harness is open or shorted
- Poor electrical connection in ambient pressure sensor circuit
How to Fix P1171 MINI Code?
Start by checking the “possible causes” listed above. Visually inspect the corresponding cable harness and connectors. Look for damaged components and check for broken, bent, pushed out, or corroded connector pins.
Possible Symptoms
- Engine light on (or service engine soon warning light)
P1171 MINI Meaning
Ambient pressure sensor learned value error is the generic description for P1171 Mini code, but the manufacturer may have a different description for your specific vehicle model and year. Currently, we have no further information about the P1171 Mini OBDII code.